À propos de Shadi
Arabe
Bilingue ou natif
Anglais
Capacité professionnelle complète
Français
Notions
Néerlandais
Notions
Expériences
- GRENOVAFounder & Managing DirectorBTP & CONSTRUCTIONjanvier 2026 - Aujourd'hui (5 mois)Liège, BelgiqueAs the head of GRENOVA, I oversee the operational and technical direction of every construction and renovation project. My role is to translate your vision into concrete solutions while ensuring technical viability and full compliance with industry standards.My Core Responsibilities:Engineering & Consultancy: Project feasibility analysis, technical diagnostics of existing structures, and strategic recommendations for materials and construction methods.Estimating & Planning: Preparation of detailed quotes, quantity surveying, and financial planning to ensure strict budget adherence.Site Management: Day-to-day project oversight, coordination of all trades (subcontractors), and rigorous quality control of execution.Administrative & Safety Management: Compliance with safety protocols and building regulations, serving as the primary point of contact for clients.
- HLG Contracting & BIC ContractingCONSTRUCTION MANAGERBTP & CONSTRUCTIONjanvier 2017 - janvier 2021 (4 ans)Abou Dabi, Émirats arabes unis
- Refurbishment and Development of the Armed Forces Officers Club & Hotel – Project P1122 (The project comprises refurbishment of existing hotel rooms and facilities & construction of new buildings (such as Catering & Logistics Facility, Banquet Hall, Laundry Facility, Sports Hub, Swimming Pool with all related buildings, Beach Club Restaurant, 5 Beach Luxurious Residential Villas, Landscaping Areas, Internal Roads & Walkways, and all related External Services for all Buildings).
- Sheikh Shakhbout Medical City (Al-Mafraq Hospital)– ABU DHABI – Project 835 (This medical city is one of the leading trauma/surgery hospitals in the region, the project comprises a two-story basement including service accommodation, labs, CSSD, dining and parking, a threestory outpatient building including clinics, a link bridge, a three-story podium building including diagnostics, operating theatres, ER, rehab, ICU and maternity, two ninestory and two 11-storey inpatient towers, Peripheral buildings including substations, cooling plant, workshop, mortuary, underground tanks and service tunnels, landscaping, infrastructure and external works).
- HLG Contracting & BIC ContractingSENIOR PROJECT ENGINEERBTP & CONSTRUCTIONjanvier 2011 - janvier 2017 (6 ans)Abou Dabi, Émirats arabes unis
- Abu Dhabi Islamic Bank New Head Quarter – ABU DHABI – Project 282 (The project comprises construction of two towers covering approximately 97.000 square meters, consisting of a GF, Mezz., 12 upper floors, 2 levels of roof and 4 levels of full area basement parking).
- St. Regis Saadiyat Island Resort – ABU DHABI – Project 831 (The 5-star hotel is comprised of 380 luxury hotel rooms, 259 residential apartments (in 7 different luxury buildings) and 33 luxury residential villas, the project also features a retail and entertainment component, a health and racquet club, a health spa and 1.600 structured parking bays in 2 basement levels).
- Zayed National Museum – ABU DHABI – Project 832 (Ground improvement, Bulk Excavation, Construction remote services facilities and substructure for the main building (including construction & testing of 1096 piles).
Recommandations
Soyez le premier à recommander Shadi
Contribuez à la réussite de ce freelance en partageant votre expérience de collaboration avec lui.
Ces profils de freelance correspondent également à vos critères
Agatha Frydrych
Backend Java Software Engineer
4.7
(3)
2
Baptiste Duhen
Fullstack developer
4.6
(4)
5
Amed Hamou
Senior Lead Developer
4
(2)
7
Audrey Champion
Web developer
4.3
(3)
4
Formations
- Bachelor's Degree - Civil EngineerAleppo University1996Bachelor’s degree in civil engineering
- ISO 9001 Awareness, HSE RiskISO 9001 Awareness, HSE Risk
Compétences
Catégories
- Autre